Construction management services for the new Asian Tropical Forest Elephant Facility at the Honolulu Zoo. As construction was completed on schedule, within budget constraints, and in accordance with the contract plans and specifications, TLCG was the honored recipient of a Letter of Appreciation from the City and County of Honolulu, Department of Design and Construction for exemplary communication and management skills.
Construction management services for roadway improvements at the intersection of Waimano Home Road and Moanalua Road, including new traffic lane alignment, concrete curbs, asphalt pavement markings, signing, street lighting, and traffic signalization.
Technical engineering services to assist the City and County of Honolulu, Department of Design and Construction—Wastewater Division (WD) in project management, construction management, and coordination of planning, design, and construction activities. Services include project coordination with city, state, and federal agencies; providing technical review of environmental documentation and other major permits and clearances; and overseeing construction, final testing, and inspection at the jobsite.
Technical engineering services in conjunction with Stepp Consulting to coordinate project management, long-range planning, construction, and maintenance operations for Phases 2 and 3 of the Honolulu Board of Water Supply Master Plan.
Construction administration and management services for the replacement of an existing on-site wastewater treatment plant that services 40 housing units. The underground installation of a new Fixed-Film Media System treatment plant features a belowground pump station and septic tank, and aboveground aeration blowers with variable speed drives.
Project management and construction administration services for an upgrade of the existing Pump Station No. 5 and Pump Station No. 7 in Hawaii Kai. Improvements to the facilities include submersible pumps, new valves, piping, and structural modifications.
Project management and construction administration services for the replacement of approximately 1,475 linear feet of 12-inch force main wastewater transmission pipeline located along Kalanianaole Highway. TLCG successfully employed the Construction Management (CM) at Risk approach for this project as an efficient, cost-effective alternative to the traditional design-bid-build process.
Project management and construction administration services for the replacement of approximately 30 linear feet of 12-inch sewer force main. This project included open-trench installation and the abandonment in-place of the existing force main.
Project management and construction administration services to rehabilitate the Hawaii Kai Pump Station No. 1. TLCG successfully employed the Construction Management (CM) at Risk approach for this project as an efficient, cost-effective alternative to the traditional design-bid-build process.
Project management and construction administration services for the rehabilitation of 2,050 linear feet of 30-inch gravity sewer along Hawaii Kai Drive using Cured-In-Place-Piping (CIPP).
Project management and construction administration services for the rehabilitation of 1,694 linear feet of 18-inch gravity sewer along Kawaihae Street in Hawaii Kai using Machine Spiral Wound PVC Liner.
Project management and construction administration services for the demolition and backfill of outdated aeration basins and secondary clarifiers at the Hawaii Kai Wastewater Treatment Plant.