Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for the demolition of an existing administration building and construction of a new building with improved on-site infrastructure. The Final EA was published in 2014 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for a facility expansion project involving the development of a nearby vacant parcel, including the construction of a two-story outpatient medical clinic. The Final EA was published in 2014 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for the proposed Oahu District Office Base Yard Canopy Extension and Maintenance Storage Building project. The Final EA was published in 2014 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for the proposed Kahuku Wells Unit No. 3. The Final EA was published in 2011 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for a planning and design project to replace an existing on-site wastewater treatment plant that services approximately 40 housing units. The Final EA was published in 2009 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) to determine a preferred site location for a proposed nonpotable water reservoir at the 215-foot elevation to serve recycled water users in the Kapolei area. In preparation of the EA, botanical and fauna, topographical, and archaeological surveys of the reservoir site, access road, and transmission main alignment were conducted. The Final EA was published in 2008 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for modifications to the Wahiawa Wastewater Treatment Plant (WWTP). This project was driven by U.S. Environmental Protection Agency Consent Decree to minimize sanitary sewer overflows at the WWTP. The Final EA was published in 2008 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for a planning and design project to correct hydraulic and structural deficiencies of approximately 42,000 linear feet of sewer line. The Final EA was published in 2007 in accordance with HRS 343. The City and County of Honolulu Department of Design and Construction, Wastewater Division, awarded TLCG with a Certificate of Appreciation for outstanding work on this project.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) for a planning and design project to correct existing hydraulic and physical deficiencies in a portion of sewer line between Oahu Community Correctional Center and the intersection of Nimitz Highway and Sand Island Access Road. The Final EA was published in 2004 in accordance with HRS 343.
Preparation of environmental studies and reports for the Wahiawa collection system and treatment plant wastewater management plan to ensure full compliance with the requirements of the Clean Water Act. An Environmental Impact Statement Preparation Notice, including a summary of public participation as part of the environmental review process, and an Environmental Impact Statement were published in 2008.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment (EA) to determine the suitability of building a second 0.5 MG reservoir on the remaining land area within the Board of Water Supply’s Aina Haina Reservoir No. 1 and Booster Station property. The final EA was published in 2012 in accordance with HRS 343.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment for a new administration and base yard facility for the Department of Land and Natural Resources in West Hawaii.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment to upgrade the camping grounds at Malaekahana State Recreation Area. This project also required shoreline certification, a Special Management Area permit, and consultations with the State Historic Preservation Division.
Preparation of all necessary environmental clearances for the publication of an Environmental Assessment for the installation of new permanent electrical infrastructure at Mana Drag Racing Strip. TLCG also obtained the following permit applications and exemptions for this project: NPDES, NOI Form C, authorizing discharges of stormwater associated with construction activities and stockpiling permits, Shoreline Setback Determination Application, Special Management Area Minor Permit, and Conservation District Use Permit Site Plan Approval.